%Option Explicit%>
Introduction
Puxin Biogas Digester
Polythene Biogas Digester
Oil Drum Digester
Click Any Photo for a Larger View
The current biogas installation at the Shamba Mtopanga. The stones in the fore- ground mark the grave.
A model of the PBD - Brian lifts the outlet.
The trench to hold the PBD
The finalized trench
The Polyethylene bag is placed into the trench.
The bag is attached to the mixing tank and filled with water, view from outlet.
The digester is filled with mixture and the pressure of the gas form a even "sausage"
The PBD installed at the Shamba Mtopanga
Together with the current biogas installation
PBD covered to protect the plastic tube form damages through falling objects and animals
Details of installation: connection and gate valve of gas pipe.
Details of installation: connection gas pipe of PDB to the existing pipe.
Details of installation: connection gas pipe of PBD to the existing pipe.
Gas storage
Back
Pictures Copyright © 2004 - 2005 R. Lattmann